New Panamax Container Ship 14K Thrust Bearing Pad Set - THBP-12461923

Part Number
THBP-12461923
Manufacturer
CSSC Holdings
Vessel Type
New Panamax Container Ship 14K
Category
Main Engine Components
Condition
Serviceable
Certification
Bureau Veritas Certified
Price
Contact us for pricing
Availability
In Stock
Request a Quote for THBP-12461923

About This Marine Part

The New Panamax Container Ship 14K Thrust Bearing Pad Set (Part Number: THBP-12461923) is a main engine components component that powers the vessel's main propulsion engine and drivetrain. This part is engineered for the New Panamax Container Ship 14K vessel platform and is manufactured by CSSC Holdings. It is available in multiple conditions including New, Overhauled, Serviceable, and As-Removed. All units come with Bureau Veritas Certified documentation and full traceability records to meet classification society and flag state requirements.

Frequently Asked Questions

Is THBP-12461923 compatible with all New Panamax Container Ship 14K configurations?
Yes, THBP-12461923 (New Panamax Container Ship 14K Thrust Bearing Pad Set) is designed for the New Panamax Container Ship 14K platform. However, specific vessel configurations, engine types, and classification society requirements can vary. Contact our team with your vessel's IMO number or specifications and we will confirm exact compatibility before quoting.
Is THBP-12461923 available in new and overhauled condition?
We source New Panamax Container Ship 14K Thrust Bearing Pad Set in multiple conditions including New, Overhauled, Serviceable, and As-Removed. The current listing shows this part in Serviceable condition. If you require a different condition, submit an RFQ and our sourcing team will check availability across our global supplier network.
What certification documentation comes with THBP-12461923?
This part is Bureau Veritas Certified. Depending on the condition and source, documentation may include original manufacturer certificates, classification society approval letters, overhaul shop release notes, and traceability records. All documentation is provided prior to shipment for your review and approval.
How quickly can THBP-12461923 be sourced and delivered?
Lead times vary based on condition, availability, and your delivery location. Stock items typically ship within 1–3 business days. For overhauled or hard-to-find parts, sourcing may take 5–15 business days. We offer AOG (Aircraft/Vessel on Ground) expedited service for urgent requirements — contact us directly for priority handling.
Can THBP-12461923 be shipped internationally?
Absolutely. Ship Parts Direct delivers to ports, shipyards, and facilities worldwide. We handle all export documentation, customs paperwork, and can arrange door-to-port or door-to-door delivery. Freight options include air freight for urgent orders and sea freight for cost-effective bulk shipments.

Related Parts for New Panamax Container Ship 14K